AHCM offers the following services:

Implementation
AHCM has extensive full-cycle experience in all of the aforementioned modules:
  • Requirements gathering
    • Meeting with stakeholders to ensure requirements are gathered and documented
  • Configuration
    • Configuration of the needed modules
  • Prototyping
    • Placing early prototypes into the hands of stakeholder/power users to ensure requirements were understood and configured
  • Testing
    • Configuration Unit Testing; User Unit Testing; User Acceptance Testing (UAT); System Integration Testing (SIT)
  • Production Cut Over
    • Moving approved configuration into a production instance
  • Inaugural cycle support
    • Core team and end user support for the first production cycle

Data Conversion
Data conversion is a task that can easily determine the success of a project.  Experience and insight into the many challenges of data conversion is critical.
  • Legacy Data
    • Determining what & how much legacy data will be converted
  • Data mapping
    • Mapping legacy data values to the appropriate places with the appropriate values
  • Validation
    • Validating converted values with an attention to detail

Post-Production Support
Many modules are executed on a year-over-year cycle basis. Things change year to year. As each cycle approaches, design and configuration will likely need to be evaluated and possibly changed.  Planning enough lead time is critical.
  • Requirements for user populations previously unconverted
  • Legislative and organizational policy changes
  • Functionality deferred from previous cycles
  • Implementation of previous cycle analysis (what went well/what did not)